Page 103 - All Signs Safety Signs
P. 103
Statutory Posters & Booklets
THE CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015
These regulations came into force on 6 April 2015 consisting of 5 parts:
Part 1 - Part 2 - Part 3 -
Part 4 - Part 5 -
The interpretation and application of the regulations.
Client duties in relation to managing construction projects.
Health & Safety duties and roles of the designers and
contractors relating to the construction phase plan.
Contains general requirements that apply to all construction sites. Contains the transitional arrangements and revocations
CDM 2015 improves Health & Safety in construction by helping to:
• Sensibly plan the work so the risks involved are managed from start to finish.
• Have the right people for the right job at the right time.
• Cooperating and coordinate your work with others.
• Have the right information about the risks and how they are being managed.
• Communicate this information effectively to those who need to know.
• Consult and engage with workers about the risks and how they are being managed.
A Guide to Part 2
For all construction projects, commercial clients musts:
• Make suitable arrangements for managing their project, enabling those carrying it out to manage H&S risks in a proportionate way. These arrangements include:
• Appointing the contractors and designers to the project (including the principal designer and principal contractor on projects involving more than one contractor) while making sure they have the skills, knowledge, experience and organisational capability.
• Allowing sufficient time and resources for each stage of the project.
• Making sure that any principal designer and principal contractor appointed
carry out their duties in managing the project.
• Making sure suitable welfare facilities are provided for the duration of the project.
• Maintain and review the management arrangements for the duration of the project.
• Provide pre-construction information to every designer and contractor either
bidding for the work or already appointed to the project.
• Ensure that the principal contractor or contractor (for single contractor projects)
prepares a construction phase plan before that phase begins.
• Ensure that the principal designer prepares a health and safety file for the project
and that is revised as necessary and made available to anyone who needs it for subsequent work at the side.
NEW
DESIGN
Health & Safety Law Poster
All employers have a legal obligation to display this
The CDM Construction Regulations
Remains the cornerstone of the continuous improvement of health, safety & welfare on site.
poster where all employees have easy access to HSLS 297 x 420mm Laminated Paper £13.02
HSLL 420 x 594mm Laminated Paper £22.75 Aluminium Snap Frame
BWM6 420 x 594mm £31.95
read it.
Accident book STAC1 A4 £7.25 STAC1A A5 £6.19
All companies with 10 or more employees are now legally obliged to keep an accident book which must be compliant to the 1998 Data Protection Act. This means it must contain the tear out pages that can be stored in a secure location.
The accident book allows for accidents to be recorded whilst also being produced on a tear off slip so details can be stored in a secure location.
Contains 50 sheets per book.
Hot work Policy & Procedures Company Fire Safety STAC3 A4 £19.51
Fire Safety Log Book STAC2 A4 £23.58
This Fire Precautions Log Book will assist employers with Fire & Safety compliance legislation.
Contents cover the following:
• Frequency of test - summary
• Example records
• Fire warning systems
• Means of escape, fire signage & notices • Fire safety training
• Emergency lighting template
Web: www.allsigns.co.uk
Tel: 01302 752 070
Email: [email protected] 103
Use these Hot Work Policy & Procedures
to aid & assist employers with Fire & Safety legislation.
Contents cover the following:
• Hot work fire safety procedures
• Administration procedures - stages 1 to 4 • Precautions
- Gas welding & cutting apparatus
- Electric welding & cutting apparatus - Blow lamps & blow torches
- Bitumen/Tar boilers
- Grinding wheels & cutting discs
• 30 tear - out Hot Work permits
CDM1 CDM2
700 x 450mm (encapsulated) 800 x 600mm (encapsulated)
£23.67 £29.13

